Control Line: Scale

LAST MONTH, I covered some basics about a model's CG and where to place the bellcrank. I also talked about the importance of balancing the model before flight as a good, basic step toward avoiding disaster on the maiden flight. This month we will continue with the control system basics by discussing some possible methods of installing and supporting, as required, the bellcrank lead-outs. I suppose that there are any number of ways in which lead-outs can be installed, but we will only cover three or four basic methods most commonly used, and perhaps a couple of the more sophisticated methods. I'll also touch on the rules with respect to the use of removable leadout guides.

Control Line: Scale

TAIL WHEEL STRUTS-again. In my March 1986 column, I presented a method of making scalelike tail wheel struts. In an effort to illustrate the difference between a dressed-up tail wheel structure and the use of a simple, piano-wire strut, I used a sketch and pictures-one of which was Richard Schneider's Curtiss Gulfhawk equipped with a piano-wire strut. It wasn't long after Richard received his March issue of MA that I heard from him. First, he was elated that the Gulfhawk was featured-but was not exactly ecstatic after reading the caption and column material. However, instead of being upset over having presented a model with a barewire tail wheel strut, Richard set out to correct the problem. Rather than cut into the model to remove the existing wheel strut and replace it, Richard offers the solution shown in the accompanying picture and sketch as an alternative.

Control Line: Scale

PERSEVERANCE. If you don't succeed at first, try again. It appears from the mail I received concerning my August and September columns on CG, balance, and lead-out positioning that they were pretty well-read. While most of the mail was supportive of the material presented, a couple of the letters, one from Paul Burke (Palmdale, CA) and another from Tom Dixon (Atlanta, GA), did point out that I could have been more specific or technical in a couple areas of my presentation. After reviewing both the column and the letters, I realized that what I presented on a model's CG wasn't quite clear enough, and with thanks to Paul and Tom for their comments, I'll try to put some words together here to provide a better picture.

Control Line: Scale

RULES CHANGE PROPOSALS. By the time you receive and read this column we will be about half way through our rules change cycle for the 1988-89 rule book. Also, according to the Rules Change Procedure schedule, you should have had an opportunity to review the new rules proposals which were in the "Competition Newsletter" section of the December issue of Model Aviation. As you have probably noticed, I submitted a dozen or more proposals in this cycle and hope that all of you interested in the competition aspects of CL Scale will carefully review them. And, regardless of whether you agree or disagree with the ideas presented, please let your district's Scale Contest Board member know how you feel so that he has some input on which to make his voting decisions.

Control Line: Scale

MULTI-ENGINE starting aid. Art Snowden, a member of the Master Ski Invaders CL Club, South Bend, IN suggests that the use of a metered switch box can be a great help when starting multi-engined models. Art is presently building a Royal B-17 for Control Line flying and during the building process has given much thought to the problems that can be encountered while trying to start four engines. He believes his switch box, which will allow all four engines to be alternately connected to the starting battery, will make the engine-starting procedure easier. The box, consisting of a series of jacks and switches, will allow all four glow plugs to be connected to the starting battery before engine-starting is attempted. A simple push of a numbered switch will allow the battery supply to be connected to the corresponding engine on the model, and when engine starting is accomplished a push of the same switch turns off the power.

Pages